County Addresses Comments Received on Plyers Mill Traffic Calming Project



CLICK HERE TO SEE THE COUNTY'S RESPONSE TO COMMUNITY COMMENTS

On Friday, March 21, 2014, Montgomery County Department of Transportation attended a community meeting organized by members of the Kensington Heights Civic Association, McKenney Hills - Carroll Knolls Civic Association, and Plyers Mill Road residents.  At the meeting, Montgomery County officials Jeff Dunckel, Seifu Kerse, and Rick Earp discussed with residents plans for improving pedestrian safety by constructing traffic calming features, sidewalks, and enhanced pedestrian crossings on Plyers Mill Road between Drumm Avenue and Georgia Avenue.  Experience with traffic calming projects at other locations in Montgomery County has demonstrated that traffic is slowed to posted speed limits with a resulting decline in pedestrian collisions.  With the decline of speeding and the addition of new improved pedestrian facilities, communities report - - and pedestrian crash data confirms - -  traffic calming projects result in much safer and more walkable communities.  

The County posted plans for the Plyers Mill traffic calming project previously on this site, and residents were asked to provide comments.  The County has addressed the comments provided, and a response can be viewed here.  Based on community feedback, the County has revised the plans.  The revised plans can be accessed at the links below.

Plyers Mill at Brunswick
Plyers Mill at Douglas
Plyers Mill at Drumm (1)
Plyers Mill at Drumm (2)
Plyers Mill at Maybrook (1)
Plyers Mill at Maybrook (2)
Plyers Mill at Saint Margaret

If you have any questions about this project, please contact the Project Manager, Seifu Kerse, at seifu.kerse@montgomerycountymd.gov.  

Monday, April 14, 2014

Pedestrian Crosswalk Stings are Back


A sting operation at an often disregarded Wisconsin Avenue crosswalk last week led to 24 citations for drivers who didn’t stop for an undercover cop posing as a pedestrian.
Next week, Montgomery County will launch a spring Street Smart campaign managed by the Metropolitan Washington Council of Governments. Jeff Dunckel, Montgomery County’s pedestrian safety coordinator, said part of that initiative will include a new wave of the undercover police crosswalk stings.
The sting last week was set up for two hours at the notorious intersection of Stanford Street and Wisconsin Avenue. Drivers there must stop for pedestrians in the crosswalk.
But with no traffic signal on the six-lane road, pedestrians say that rarely happens.
Last June, police nabbed 22 drivers for failing to stop with a pedestrian in the crosswalk. Last April, as county officials and police began an aggressive spring pedestrian safety initiative, a motorist mowed down one of the pedestrian signs at the crosswalk.
Esther Bowring, a county government spokesperson, said police do regular enforcement of pedestrian safety laws. The effort that will begin next week is a more concentrated effort to raise awareness with more and more pedestrians taking advantage of warmer weather.
The decoy pedestrian police stings started last year.  Officials began putting the enforcement focus on drivers who were violating the law, not just pedestrians jaywalking or crossing without the walk signal.
Source: Bethesda Now, April 11, 2014
To see a video about crosswalk stings, click here.
To hear an audio clip on the stings, click here.

Thursday, March 27, 2014

Dale Drive Sidewalk Completed

The Division of Transportation Engineering has recently completed construction of 1900 feet of new sidewalk along the north side of Dale Drive, from Mansfield Road to Hartford Avenue in Silver Spring. This project was part of the Transportation Improvements for New Schools program, which funds improvements to serve County public schools. The program has previously constructed sections of other sidewalk along Dale Drive from Wayne Avenue to Piney Branch Road. This latest sidewalk provides connectivity to the Sligo Creek Elementary School, the Silver Spring International Middle School, as well as to downtown Silver Spring, Sligo Creek Park, and bus stops.

The project involved construction of significant retaining walls more than 300 feet long and ranging in height from three to 11 feet. Also part of the project was a storm drainage system and gas, sewer, and water utility relocations.

The contractor was Banneker Ventures LLC. Significant construction work was undertaken by subcontractorM. Luis Construction Company, a local woman-owned business recently honored by the President when he visited their asphalt manufacturing plant in Rockville.

For more information, contact Shirley Reeves-Collette, Project Manager, at 240.773.3412 or by email. For budget details on the project, see the Office of Management and Budget website. For information on transportation construction projects, visit the Division of Transportation Engineering's website.

Thursday, February 6, 2014

Montgomery County Department of Transportation Installs Two New Sidewalks

The Montgomery County Department of Transportation Division of Transportation Engineering's New Sidewalk program has recently completed two new sidewalk links to enhance pedestrian connectivity in the county.

  • In the Silver Spring area, a link was installed along Franklin Avenue, from Colesville Road/US29 to University Boulevard/MD193. This project cost approximately $437,700.
  • In the Silver Spring area, a link was installed along Melbourne Avenue, at the dead end. This project cost approximately $4,900.
Other new sidewalk links constructed in fiscal year 2014 include the following. 
  • In the Potomac area, a link was installed along Oaklyn Drive, from Persimmon Tree Road to Avenel Farm Road. This project cost approximately $237,700.
  • In the Potomac/Bethesda/Cabin John Creek area, a link was installed along River Road, from Bradley Boulevard to Clewerwell Drive. This project cost approximately $125,300.

For more information on the New Sidewalk program, including how to request a new sidewalk in your neighborhood, visit the Division of Transportation Engineering's website

Tuesday, October 1, 2013

County Council Pedestrian Safety Program Update Highlights Improvements to Pedestrian Safety

On September 24, 2013, Montgomery County’s Department of Transportation presented to the County Council updates from the successful Pedestrian and Bicycle Safety Programs. The programs use data-driven approaches to increase bicycle and pedestrian safety throughout the county.
The Bicycle Safety Program completed evaluations of BikeShare routes, the most recent addition to the county’s extensive transportation network, to address challenges the county’s existing roadways pose for bikers. After thorough analysis of potential bike routes, many bicycle  engineering improvements were made to both on-road and off-road facilities across the county.
The Pedestrian Safety Initiative, introduced in December 2007, coordinates engineering, education and enforcement efforts to change pedestrian and driver behavior. The program uses a data-driven approach to target efforts in areas with the highest rates of pedestrian collisions, also known as High Incidence Areas (HIAs). Engineering efforts in HIAs include: sidewalk improvement, intersection and signal reconstruction, pedestrian refuge construction, street lighting, and curb markings.  Since beginning program implementation in 2009, pedestrian collisions in these HIAs have decreased by 43%. 
Traffic calming, another major part of the Pedestrian Safety Initiative, has reduced collision rates by 50% by reducing speeds to posted speed limits.
The Safe Routes to School program conducted comprehensive school zone traffic safety assessments in over 160 schools and subsequently implemented engineering, education and enforcement actions. Since 2009, there has been a 79% reduction in the number of pedestrian collisions within a ¼ mile radius of these schools.
Following the data-driven methodology, education efforts have been modified to reflect recent data trends. From 2010 to 2012, there have been 172 pedestrian collisions within ½ mile of Montgomery County’s High Schools, of which 30 involved 13-18 year olds. This fall, the county is launching a High School Pedestrian Safety Education Campaign, which analyzes crash data to target and work directly with high schools’ administration and staff.
In 2012, there was a 39% increase in the number of pedestrian collisions in parking lots and garages; representing 30% of all the county’s pedestrian collisions. The county has launched the Parking Lot Pedestrian Safety Education Campaign, which works directly with the private property owners and managers operating parking lots to raise public awareness of the need exercise caution and to keep “Heads Up” in Parking Lots. 
Enforcement efforts, led by the Montgomery County Police Department, have given out 600 warnings and 1,600 citations in HIAs to drivers and pedestrians, while over 80 warnings and 400 citations have been given out through crosswalk sting operations. Recent results in the enforcement efforts show increased court support for citations, media’s expanded role in raising awareness, citations being more effective over warnings, and residents being active in participating in pre-enforcement education activities. Since 2011, when expanded enforcement efforts began, there has been an increase in drivers found at fault in pedestrian collisions and a decrease in pedestrians found at fault: drivers are found at fault in 59% of reported pedestrian collisions.

As serious pedestrian collisions have continued to decrease where actions have been targeted, the County continues to focus on improving safe bicycle access on county roads, and coordinating enforcement, education and engineering efforts to improve pedestrian safety. Also, the county continues to cooperate and coordinate their efforts with the Pedestrian, Bicycle and Traffic Safety Advisory Committee. 
To view the presentation, click below:

Thursday, August 29, 2013

State begins safety and resurfacing project on Georgia Avenue/MD97

The Maryland State Highway Administration (SHA) has begun a $4.6 million safety and resurfacing project along nearly two miles of MD97 (Georgia Avenue) from the Washington, D.C. line to MD390 (16th Street) in Silver Spring. Weather Permitting, the work will be completed by late fall. Motorists and pedestrians traveling in this area should plan ahead, add extra commute time and be aware of shifting traffic and walking patterns.

The work will:
  • Reconstruct existing sidewalks to ensure they meet ADA standards and are at least five feet wide;
  • Repair and replace existing inlets and pipes;
  • Patch damaged sections of pavement prior to resurfacing;
  • Install new curb and gutter;
  • Resurfacing Georgia Avenue;
  • Replace traffic signal pavement detectors at the intersection of MD 97 and MD 390; and
  • Install new line striping and pavement markings.
SHA's contractor is permitted to close one lane of Georgia Avenue in both directions weekdays between 9 a.m. and 3 p.m. and up to two lanes overnight Sunday through Thursday, between 10 p.m. and 5 a.m.

Drivers are urged to stay alert and look for reduced speed limits, narrow driving lanes and highway workers. For more information, see SHA's press release.

Tuesday, August 20, 2013

Seven Locks sidewalk project adds to County's pedestrian infrastructure

MCDOT’s Division of Transportation Engineering recently installed a mile and a quarter of new sidewalk along Seven Locks Road. In response to a request from the president of the Montgomery Square Civic Association, MCDOT replaced a series of asphalt and dirt paths between Montrose Road and Tuckerman Lane. This project included the installation of ADA compliant ramps, selected driveway aprons, and new, five foot wide concrete sidewalk panels.

This sidewalk project, costing about $270,000, provides a safe and convenient connection for pedestrians to synagogues, churches, retail stores, and other activity centers. MCDOT’s Sidewalk Program provides such funding to expand the sidewalk network throughout the county. Concurrently, the Division of Highway Services is also resurfacing this same segment of Seven Locks Road. They will be milling and patching the pavement where needed, applying a layer of hot mix asphalt, then re-striping the road.